天津铜锣湾广场深基坑开挖流固耦合分析

Coupled fluid-mechanical analysis of deep excavation for Tianjin causeway bay plaza
下载PDF
导出
摘要 通过对天津铜锣湾广场深基坑开挖过程的流固耦合分析,揭示了主、被动土压力和孔隙水压力的分布规律,探讨了开挖前期降水对土体变形的影响,验证了该深基坑工程设计的合理性。所得结论,对类似工程有重要的理论指导意义和借鉴价值。 Numerical analysis for deep excavation in Tongluowan Square of Tianjin has been done according to coupled fluid-mechanical theorem. In this way, the general rules of soil pressure and pore water pressure were proposed. This paper also discusses the relationship between prior dewatering and soil movement. Based on the analysis, the feasibility of excavation design is evaluated. Some conclusions obtained are useful for the future construction and other structure designs.
出处 《河北农业大学学报》 CAS CSCD 北大核心 2008年第4期102-106,共5页 Journal of Hebei Agricultural University
基金 河北省教育厅项目(2007446) 河北省科技支撑计划项目(072156162)
关键词 深基坑开挖 流固耦合 土压力 孔隙水压力 前期降水 deep excavation coupled fluid-mechanical theorem soil pressure pore water pressure prior dewatering
  • 相关文献

参考文献7

二级参考文献22

  • 1陈平,张有天.裂隙岩体渗流与应力耦合分析[J].岩石力学与工程学报,1994,13(4):299-308. 被引量:126
  • 2罗晓辉.深基坑开挖渗流与应力耦合分析[J].工程勘察,1996,24(6):37-41. 被引量:44
  • 3高俊合.深基坑支护结构设计理论研究:博士学位论文[M].南京:河海大学,1998..
  • 4薛禹国 谢春红.水文地质学的数值法[M].北京:煤炭工业出版社,1980..
  • 5高俊合,博士学位论文,1998年
  • 6薛禹国,水文地质学的数值法,1980年
  • 7Li Y C.Finite element analysis for a finite conductivity fracture in an infinite poroelastic medium[J].Int J Numer Anal Meth Geomech,1999,23:187-215.
  • 8李术才 邱祥波.厦门暗挖海底隧道方案最小安全顶板厚度研究[R].武汉:中国科学院武汉岩土力学研究所,2002..
  • 9ItascaConsultingGroup Inc.FLAC3D使用手册[M].USA,1999..
  • 10Dahlo T S, Nilsen B. Stability and rock cover of hard rock subsea tunnels [J]. Tunneling and Underground Space Technology,1994,9(2): 151 - 158.