期刊文献+

宝钢炼钢连铸调度系统的动态调整集成技术 被引量:1

Integrated Dynamic Adjustment Technology for Baosteel Steelmaking and Concasting Scheduling System
下载PDF
导出
摘要 炼钢连铸生产计划调度系统是钢铁企业制造执行系统的重要组成部分,在企业的生产管理中起着承上启下的作用。介绍了宝钢炼钢连铸调度计划系统的基本功能,着重阐述了宝钢炼钢连铸调度的动态编辑器和动态调度的集成功能。实践表明,该系统可以极大地提高计划编制和计划调整的效率。 The production scheduling system for steelmaking and concasting is an important component part of the manufacture execute system (MES) in any iron and steel producers. It plays an important role in enterprise' s production management, linking the preceding and following actions. The basic function of the Baosteel steelmaking and eoneasting scheduling system is introduced, with its dynamic editor and dynamic function being described in detail. It is proved that this system can enhance the efficiency of the schedule plan and schedule adjustment.
出处 《宝钢技术》 CAS 2008年第6期39-43,共5页 Baosteel Technology
关键词 动态调度 炼钢 精炼 连铸 dynamic schedule steelmaking refining coneasting
  • 相关文献

参考文献1

二级参考文献28

  • 1Jackson J R.Simulation research on job shop production[J],1957(04).
  • 2Redwine C N;Wismer D A.Mixed integer programming model for scheduling orders in a steel mill[J],1974(09).
  • 3Sato S;Yamaoka T;Aoki Y.Development of integrated scheduling system for iron and steel works,1977(11).
  • 4Shah M J;Damian R;Silverman J.Knowledge based dynamic scheduling in a steel plant[C],1990.
  • 5Dagli C;Huggahalli R.A neural network architecture for faster dynamic scheduling in manufacturing systems[C],1991.
  • 6Khalid K.Using multi-agent architecture in FMS for dynamic scheduling,1997(08).
  • 7Kondakci S;Gupta R M.Interactive approach for a dual-constraint job shop scheduling problem,1991(03).
  • 8Bistline W G Sr;Banerjee S;Banerjee A.An interactive decision support system for solving real time scheduling problems considering customer and job priorities with schedule interruptions,1998(11).
  • 9Liu M;Wu Ch.Identical parallel machine scheduling problem for minimizing the makespan using genetic algorithm combined by simulated annealing,1998(10).
  • 10Yang S X;Wang D W.Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling[J],2000(02).

共引文献27

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部