摘要
上海市东西通道工程与轨道交通14号线共用一个走廊,均布设在沿线条件十分复杂的浦东大道下。如何进行合理的一体化布置是做好本工程的关键。结合两工程特点,从交通功能、结构合理性、对环境及交通的影响、工程量、车站布置以及分期实施情况等方面对一体化布置方案进行了研究和探讨,并提出了推荐意见。
Shanghai East-west Underpass Engineering shares a corridor with Rail Transit Line 14 under Pudong Avenue,where the surrounding environment is complicated.How to properly arrange the space is the key for this engineering.According to the specific condition of this two projects,study and exploration has been made from the aspects of traffic function,structural rationality,effect on environment and traffic,amount of work,station layout and construction in different phases and recommendations are proposed.
出处
《地下工程与隧道》
2008年第4期28-31,35,共5页
Underground Engineering and Tunnels