期刊文献+

装备科研项目后评价指标体系及模型 被引量:1

Research on Post Evaluation Index System and Model of the Equipment Scientific Research Project
下载PDF
导出
摘要 为客观、科学地进行装备科研项目后评价提供理论分析和实践依据,在分析装备科研项目后评价特点的基础上,建立了装备科研项目后评价指标体系,确定了指标的权重,并采用多层次模糊综合评价法建立了装备科研项目后评价模型。 Based on analyzing the characteristic of the equipment scientific research project post evalution, the index of the equipment scientific research project post evalution was established, the scale of those indexes was confirmed, and the multi-level fuzzy appraisal was used to establish post evaluation model. The research can provide the academic's foundation and implementary's gist for the post evaluation of the equipment scientific research project
出处 《海军航空工程学院学报》 2008年第6期711-713,720,共4页 Journal of Naval Aeronautical and Astronautical University
关键词 装备科研项目 后评价 指标体系 多层次模糊综合评价 equipment scientific research project post evalution index system multi-level fuzzy appraisal
  • 相关文献

参考文献4

二级参考文献19

  • 1胡笙煌.层次灰色评价软科学研究成果[J].科学管理研究,1995,13(1):34-41. 被引量:17
  • 2曹刚川.坚决贯彻江主席重要指示 积极推进“四个机制”的建立和完善[J].中国军事科学,2002,15(2):1-7. 被引量:2
  • 3顾基发.评价方法综述[A]..科学决策与系统工程[C].北京:中国科学技术出版社,1990.22~26.
  • 4梅绍祖,贾艳玲.企业技术改造项目综合效益后评价[J].系统工程理论与实践,1997,17(5):78-81. 被引量:6
  • 5[美]防务系统管理学院编著.国防采办管理概览[Z].北京:军用标准化中心,2000.
  • 6中华人民共和国国家军用标准.武器装备研制项目管理GJB2993-97[S].北京:国防科工委军标出版发行部,1997.
  • 7"我军武器装备全系统全寿命管理研究"课题组.我军武器装备全系统全寿命管理研究[Z].北京:总装备部情报研究所,1999.
  • 8[美]防务系统管理学院编著.国防采办风险管理[Z].北京:军用标准化中心,2000.
  • 9杨星.军品科研项目后评价及应用研究(硕士学位论文)[D].西安:西北工业大学,2001.
  • 10白思俊.现代项目管理(下)[M].北京:机械工业出版社,2003.

共引文献38

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部