架空绝缘配电线路雷击断线机理和防护措施
摘要
城市架空配电网的绝缘化率不断提高,有些城市达到90%以上。架空绝缘配电线路的优点非常明显,但随着城市架空配电线路的绝缘化率提高,绝缘导线雷击断线问题日益突出。
出处
《电世界》
2008年第12期6-9,共4页
Electrical World
二级参考文献13
-
1[1]Lee R E,Fritz D E,Stiller P H,et al.Prevention of covered conductor burndown on distribution circuits[J].Power Conf,1980,(4).
-
2[2]Morooka Y,Katahira O,Maeda K,et al.Faults on the electric power system of kyushu electric power[A].In the proceedings of 1996 Korea-Japan joint symposium on electrical discharging and high voltage engineering[M].Seoul,1996.
-
3[3]Nakada K,Yokoyama S,Yokota T,et al.Analytical study of failure rates of surge atrresters on power distribution lines due to winter lightning[A].In the Proceedings of 1997 Japan-Korea joint symposium on electrical discharging and high voltage engineering[M].Fukuoka,1997.
-
4[4]Morooka Y,Yokoyama S,Asakawa A.Protection of power distribution lines against lightning-induced overvoltages by means of surge arresters and overhead ground wire[A].In the proceedings of 8th international symposium on high voltage engineering[M].Yokoyama,1993.
-
5[5]Yokoyama S,Yamamoto K,Kinoshita H.Analogue simulation of lightning induced voltages and its application for analysis of overhead-ground-wire effects[J].IEE Proceedings,1985,(4).
-
6[6]Nakada K,Yokota T,Yokoyama S,et al.Energy absorption of surge arresters on power distribution lines due to direct lightning strokes-effects of an overhead ground wire and installation position of surge arresters[J].IEEE Trans,1997,(4).
-
7[7]Short T A,Burke J J,Mancao R T.Application of MOVs in the distribution environment[J].IEEE Trans,1994,(1).
-
8[8]Romualdo T C,Cornick K J.Lightning performance of distribution lines protected with surge arresters[A].In the Proc.of 10th international symposium on high voltage engineering[M].Montreal,Quebec,1997.
-
9[9]Morooka Y,Yokoyama S,Asakawa A.Protection of power distribution lines against lightning-induced overvoltages by means of surge arresters and overhead ground wire[A].The Proc.of 8th international symposium on high voltage engineering[M].Yokohama:1993.
-
10[10]Washino M,Fukuyama A,Kito K,et al.Development of current limiting arcing horn for prevention of lightning faults on distribution lines[J].IEEE Trans,1988,(1).
共引文献337
-
1靳希,陈守聚,鲁炜,屠志健.线路装耦合地线后耐雷水平计算与过电压分析[J].高电压技术,2004,30(6):17-18. 被引量:19
-
2陈明良.中压电网中性点电阻接地的应用[J].冶金动力,2004(4):5-8. 被引量:1
-
3石启新,谈顺涛.基于MATLAB的PT铁磁谐振数字仿真研究[J].浙江电力,2004,23(4):6-9. 被引量:3
-
4徐建平.接地电阻测量方法的误差分析与工程实践[J].浙江电力,2004,23(4):23-27. 被引量:8
-
5张捷,陆敏,张玮,章红,孙倩薇.消弧线圈自动调谐装置应用分析[J].黑龙江电力,2004,26(5):380-382. 被引量:1
-
6夏庆辉.500kV变电站带电作业研究与实践[J].中国电力,2004,37(10):27-30. 被引量:3
-
7石启新,谈顺涛.不接地系统中电磁式TV异常运行的仿真分析[J].高电压技术,2004,30(10):34-36. 被引量:6
-
8林幼晖.深圳前湾天然气电厂高压避雷器的配置[J].高电压技术,2004,30(10):70-71.
-
9谷定燮,樊灵孟.对我国500kV线路防雷的新思考[J].电力技术(北京),2004,37(12):18-21. 被引量:55
-
10丁永辉.中相V型绝缘子串的设计要点[J].江苏电机工程,2004,23(6):59-61. 被引量:7
-
1耿世艳.架空绝缘配电线路防雷保护措施的技术经济比较[J].科技视界,2013(26):383-383.
-
2赵民.架空绝缘配电线路施工安全问题的探讨[J].石油化工安全技术,2005,21(3):31-32. 被引量:2
-
3张瑶.10kV及以下架空绝缘配电线路在城镇的架设[J].电世界,1994,35(8):22-23.
-
4王鑫,赵春枝.浅谈中压架空绝缘配电线路的防雷措施[J].供用电,2005,22(4):17-19.
-
5项昌富,康应成,吴夕科,马爱武,杨芳.架空绝缘配电线路的防雷措施[J].供用电,1995,12(6):11-13. 被引量:2
-
6方洁.架空绝缘配电线路施工问题的探索[J].中小企业管理与科技,2009(36):314-314. 被引量:3
-
7张瑶.10kV及以下架空绝缘配电线路在城镇的架设应用[J].浙江电力,1994,1(1):59-61.
-
8余力,许钢.浅谈架空绝缘配电线路防雷措施[J].江西电力职业技术学院学报,2009,22(4):32-33. 被引量:4
-
9杨学明.防雷措施在架空绝缘配电线路中的使用[J].建材与装饰(中旬),2008,0(2):89-90.
-
10段国琼.对10kV架空绝缘配电线路防雷措施的探讨[J].中国新技术新产品,2011(2):184-184. 被引量:4