期刊文献+

连续梁桥整体顶升方案及应力应变测试研究 被引量:6

The study on the jack-up scheme of the continuous girder bridge and stress-strain test
下载PDF
导出
摘要 以京沪高速公路淮安废黄河大桥为例,研究了连续梁桥支座更换工作中多孔桥梁整体顶升方案,并采用电阻应变法监测试顶过程中梁体的应力应变增加值,验证了整体施工方案的可行性。 Taking waste Yellow river Bridge at the Huai' an in the Beijing-Shanghai highway as an example, the paper studies the jack-up scheme for multi-span bridge girder in the bearing replacement of the continuous girder bridges and points out to adopt the electric resistance- strain method to inspect the increasing number of the strain of the girders in the test of jack-up, and it also proves the feasibility of the construetion scheme.
出处 《山西建筑》 2009年第1期5-7,共3页 Shanxi Architecture
基金 淮安市科技计划项目资助(项目编号:HAG06-013)
关键词 连续梁 支座 顶升 电阻应变法 continuous girder, bridge support, jack-up, electric resistance method
  • 相关文献

参考文献5

二级参考文献1

共引文献72

同被引文献25

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部