胶济铁路客运专线基床表层级配碎石施工

Construction of graded crushed stone construction of the surface layer of subgrade bed of Jiaoji passenger dedicated railway
下载PDF
导出
摘要 总结了胶济铁路客运专线基床表层级配碎石配合比选择和制备工艺,从碾压、含水量和检测等几方面提出了级配碎石的施工质量控制方法,积累了级配碎石施工经验,可以为类似客运专线施工提供借鉴。 It summarizes the mixing rate choosing and making technique of the graded crushed stone of the surface layer of subgrade bed of Jiaoji passenger dedicated railway and puts forward quality control method of graded crushed stone construction from compaction, water content and testing, which accumulates graded crushed stone construction experience and provides a reference for similar passenger dedicated railway construction.
作者 王朝鹏
出处 《山西建筑》 2009年第1期289-290,共2页 Shanxi Architecture
关键词 客运专线 基床表层 级配碎石 质量控制 passenger dedicated railway, the surface layer of subgrade bed, graded crushed stone, quality control