结合观音桥枢纽互通B匝道桥工程实例,对连续梁桥悬臂施工的施工控制过程模拟、施工控制中的现场监测项目与监测方法等进行了介绍,并对施工中需注意的事项提出几点建议。
Based on the project of Ramp B of Guanyin Bridge hinge interchange, the paper introduces the construction process simulation, actual monitoring parameters and monitoring methods of the construction control in the continuous beam bridge cantilever casting. A few suggestions about the construction are put forward also.