某隧道大型溶腔泄水处理措施

Treatment Measures for Large-scale Dissolving Cavity Sluicing in a Tunnel
下载PDF
导出
摘要 某隧道为宜万铁路重点控制工程之一,具有多种不良地质的特长铁路隧道,施工中发生了特大溃水自然灾害,造成严重事故。通过对隧道溃水产生原因及溶腔勘探情况分析研究,采取了一系列行之有效的处理措施,在平导左侧增设泄水洞,快速而有效地完成了泄水施工,达到了泄水减压的目的。介绍了隧道溶腔勘探情况和泄水施工处理措施。 In this paper, an extra long railway tunnel with various bad geological conditions is the focus, which is also one of key controlling projects of Yichang to Wanzhon Railway. During its construction, the natural calamity of water bursting caused a serious accident. After studying the cause of water bursting and analyzing the dissolving cavity, a series of effective treatment measures were adopted to ensure the safety of construction and operation. Sluicing holes were added on the left side of the parallel heading, which quickly and effectively finished the project of sluicing, achieving the purpose of sluicing and reducing pressure. This article introduces the exploration of the tunnel dissolving cavity and the treatment measures of sluicing.
作者 黄雄军
出处 《铁道建筑技术》 2008年第6期61-64,80,共5页 Railway Construction Technology
关键词 特长隧道 大型溶腔 泄水 处理措施 extra long tunnel large-scale dissolving cavity sluicing treatment measure
  • 相关文献

参考文献2

二级参考文献9

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部