摘要 草楼铁矿破碎系统经过一段时间运行后,其上部矿仓出现仓壁部分空洞的现象,通过分析仓壁空洞现象出现的原因,设计出合理的加固方案;并提出了矿仓设计、管理及施工中应注意的问题。经过一段时间的使用,再次下井观察后发现加固措施安全有效,加固后的矿仓壁状况良好,满足使用要求,达到加固的目的。 After a period of operation, the underground crushing system in Caolou Iron Mine was found to have a cavity in its upper bin. The causes for the cavity in the bin wall were analyzed, a rational reinforcement plan was designed and issues needing attention in ore bin design, management and construction were proposed. The inspection made after a period of operation of the reinforced bin indicates that the reinforcement measures are effective and safe and the reinforced bin wall is in good condition, satisfying the requirement and achieving the reinforcement purpose.
出处 《金属矿山》 CAS 北大核心 2008年第12期27-30,共4页 Metal Mine
关键词 破碎系统 上部矿仓 破坏分析 加固方案 Crushing system, Upper bin, Failure analysis, Reinforcement plan
  • 相关文献

参考文献6

二级参考文献10

  • 1于双忠.煤矿工程地质研究[M].徐州:中国矿业大学出版社,1991.130-133.
  • 2煤炭科学研究总院北京开采研究所.地下开采现代技术理论与实践[M].北京:煤炭科学出版社,2002..
  • 3[7]Itasca Consulting Group,Inc.Fast Language Analysia of Continua in Three Dimensions[R].Itasca Consulting Group,Inc,1997.
  • 4[8]Chen X,TAN C P,Haberfield C M.Numerical Evaluation of The Deformation Behaviour of Thick-walled Hollow Cylinders of Shale[J].International Journal of Rock Mechanics and Mining Sciences,2000,37(6):947-961.
  • 5[13]Rcest J P A.The self supporting rock ring[J].Proceed of Mining and Technology,1985:cd4.
  • 6矿山压力与顶板管理.中国矿业大学学报,2003,(1).
  • 7煤炭科学技术,2004,.
  • 8李文平,赵向军,杨海滨.煤矿延深巷道人工神经网络工程地质分类方法[J].中国矿业大学学报,1999,28(1):69-73. 被引量:4
  • 9严春风,徐健,陈彦峰,陈易梅.岩体Hoek-Brown经验强度准则参数随机特征分析[J].岩石力学与工程学报,1999,18(5):542-545. 被引量:16
  • 10刘全林,杨敏.软弱围岩巷道锚注支护机理及其变形分析[J].岩石力学与工程学报,2002,21(8):1158-1161. 被引量:72

共引文献42

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部