建设项目的全过程造价管理与控制 被引量:5

A elementary introduction to the Whole-process Cost Management and control of Construction Projects
下载PDF
导出
摘要 工程造价的管理与控制不能只局限于预结算的编制与审核,应扩展到工程造价的全过程造价管理与控制,尤其应将重点转移到投资决策、设计、招投标、合同签订等前期阶段的工程造价的管理与控制上来,以实现最理想的工程项目管理。如何建立一套系统有效的工程造价管理机制,改变目前这种"铁路警察各管一段"的现状,以实现对工程造价卓有成效的控制。这就是作者想要论述的建设项目的全过程造价管理与控制。 The project cost management and control can not be limited to the budget and final ncceounting. It should be extended to the whole process of project cost, in particular, the emphasis should be transferred to the investment decision-making, design, bidding, contracting, such as the early stage of the project-cost and management and control in order to achieve the best project management. How to set up an effective mechanism for the management of project cost to change the "separate status ",in order to realizes the building cost of projects fruitful control, which is the author want to discuss.
作者 刘佳
出处 《湖南科技学院学报》 2008年第12期35-37,共3页 Journal of Hunan University of Science and Engineering
关键词 建设项目 全过程 造价管理与控制 Construction Projects whole-process cost management
  • 相关文献

参考文献2

  • 1建设工程造价管理协会.建设工程造价管理理论与实务(一)[M].北京:中国计划出版社,2008.
  • 2造价工程师执业资格考试培训指定用书.工程造价的确定与控制[M].北京:中国计划出版社,1997.

共引文献1

同被引文献6

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部