摘要
以地质、技术和经济条件作为夏茂线位方案研究比选的主要依据,对夏茂长隧道方案和短隧道方案进行了研究与探讨,得出短隧道方案是可行性方案的结论。
This paper discusses the long tunnel scheme and the short tunnel scheme for the Xiamao line, comparison and selection have made based on the geological condition, technology and economic statistics, conclude that the short tunnel scheme design is a practical one .
出处
《交通科技》
2008年第6期95-96,100,共3页
Transportation Science & Technology
关键词
铁路选线
方案
比选
railway location
scheme
comparison and selection