摘要
工程变更控制贯穿于项目实施的各个阶段。工程变更一旦发生,对工程的施工进度、质量、成本控制以及各方关系的协调都会带来一定的影响。首先分析了工程变更产生的原因,然后介绍了设计、招标、施工、竣工决算各阶段控制工程变更及变更费用的措施。
Variation in works may occur through the whole period of execution of the project. Once a variation occurs, the construction progress, quality, cost control and coordination between relevant parties will all be affected. Analysis is made of the cause for the occurrence of a variation, and then measures for control over the variation in works and in cost at the stages of design, tender, construction and completion settlement.
出处
《中国市政工程》
2008年第6期50-52,共3页
China Municipal Engineering