长潭河水利枢纽导流隧洞进口段开挖及支护设计 被引量:2

Excavation and support design for diversion tunnel inlet section of Changtanhe Hydraulic Complex
下载PDF
导出
摘要 长潭河水利水电枢纽工程导流隧洞进口段岩石风化,层间错动及节理裂隙发育,岩体结构松散,开挖时存在围岩稳定问题。为保证隧洞及早进洞和施工期安全,对该段采取先开挖导洞再进行扩挖并采用管棚法施工。介绍了隧洞进口段开挖与支护的设计。 There exist weathered rock mass, interlayer faults and developed joint fissures at the inlet section of the diversion runnel of Changtanhe Hydraulic Complex. Loose rock may lead to stability problem of surrounding rock during excavation. In order to accelerate tunneling while ensuring construction safety, a pilot tunnel is excavated first before expansion excavation with pipe-roof method adopted. The author also introduced the excavation and support design for the inlet section of the tunnel.
出处 《广西水利水电》 2008年第6期59-61,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 长潭河水利水电枢纽 导流隧洞施工 导洞开挖 管棚法 Changtanhe Hydraulic Complex construction of diversion tunnel excavation of pilot tunnel piperoof method
  • 相关文献

同被引文献5

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部