台州市椒江污水处理厂二期工程优化设计 被引量:5

Optimization Design of Extension Project of Jiaojiang Wastewater Treatment Plant in Taizhou City
下载PDF
导出
摘要 台州市椒江污水处理厂已建一期工程规模为5×104m3/d,二期扩建工程规模为10×104m3/d,其中医药化工废水设计水量约为2×104m3/d,市政污水设计水量约为8×104m3/d。两种污(废)水采用不同的预处理工艺,然后混合进入生化及消毒处理工段,主工艺采用二段法长泥龄延时曝气处理工艺。介绍了医药化工废水的水质特点、分质预处理的工艺方案、工艺流程、工程设计参数、设备配置情况等,并在总结一期运行经验的基础上,对二期工程的设计方案进行了优化。 The first-phase project of Jiaojiang Wastewater Treatment Plant in Taizhou City, with a capacity of 5 ×10^4m^3/d, has been completed. The capacity of its second-phase extension project is 10 ×10^4m^3/d, including approximately 2 ×10^4m^3/d pharmaceutical and chemical wastewater, and 8×10^4m^3/d other municipal wastewater. After treated by different pretreatment processes, these two wastewaters enter into biochemical and disinfection sections after mixing. The two-stage extended aeration process with long SRT process is applied as the main wastewater treatment process. The characteristics of pharmaceutical and chemical wastewater, the pretreatment processes of different quality wastewaters, the process flow of the whole plant, the engineering design parameters and the equipment configuration are introduced. The experience, which is obtained from summarizing the operation of the first-phase project, is used to optimize the design of the second-phase extension project.
作者 边靖 徐保祥
出处 《中国给水排水》 CAS CSCD 北大核心 2009年第2期47-51,共5页 China Water & Wastewater
关键词 污水处理厂 医药化工废水 预处理 二段法处理工艺 二段法长泥龄延时曝气工艺 wastewater treatment plant pharmaceutical and chemical wastewater pretreatment two-stage treatment process two-stage extended aeration process with long SRT
  • 相关文献

参考文献1

二级参考文献7

  • 1桥本奖.新活性污泥法[M].北京:学术书刊出版社,1990.87-110.
  • 2宗宫功 张荪楠 等.污水除磷脱氮技术[M].北京:中国环境科学出版社,1987..
  • 3埃肯费尔德W W 等 姜文焯等(译).工业废水的活性污泥处理法[M].北京:中国建筑工业出版社,1998..
  • 4姜文焯(译),工业废水的活性污泥处理法,1998年
  • 5郑兴灿,污水除磷脱氮技术,1998年
  • 6桥本奖,新活性污泥法,1990年
  • 7宗宫功,污水除磷脱氮技术,1987年

共引文献4

同被引文献8

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部