摘要
结合杭州市北门站高-中压调压器后管道低温结冰的运行实例,分析了调压节流后的低温燃气对管道系统的影响,提出了设计和校核的方法。
Combined with the icing phenomenon of pipeline after the high-medium pressure regulator during the practical operation of Hangzhou North Gate Station, the influence of low temperature gas caused by pressure regulation throttling control on the pipeline system is analyzed, and the methods of design and check are put forward.
出处
《煤气与热力》
2009年第1期1-4,共4页
Gas & Heat
关键词
门站
调压站
节流效应
gate station
regulator station
throttling effect