摘要
介绍了上海外滩交通枢纽工程中地下车道与楼板错层的概况,对1号车道可能采用的两种结构体系进行比选和优化,得出了采用框架柱墙板体系能够将左右两个方向对称的侧向力平衡掉,因此更合理的结论。
The author introduces the general situation of the underground lane and the staggered floor in the traffic hub project in the Bund in Shanghai, carries out the comparison and the optimization of two structure systems" used in No. 1 lane, draws a conclusion that the symmetric lateral force of the left and right directions can be balanced by using the frame column wallboard system, so it is more reasonable.
出处
《山西建筑》
2009年第2期268-269,共2页
Shanxi Architecture
关键词
地下车道
错层
结构体系
比选
优化
underground lane, staggered floor, structure system, comparison, optimization