摘要
结合小兴浪大桥的概况,介绍了小兴浪大桥转体系统的基本组成,提出了该大桥转体施工的主要步骤及转体过程中应注意的相关事项,指出桥梁转体施工工艺较为复杂,满足转体要求后,才能进行转体,以确保施工顺利进行。
Combined with the general situation of Xiaoxinglang Bridge, the basic composition of Xiaoxinglang Bridge rotation system was introduced. The principle procedure of its rotation construction and related attentions during construction were proposed. It pointed that the bridge rotation construction technology was complex, which could rotated only satisfying rotation requirement so as to guarantee construction smooth running.
出处
《山西建筑》
2009年第2期307-308,共2页
Shanxi Architecture
关键词
大桥
转体
施工方案
bridge, rotation, construction plan