摘要
对一般放样方法和利用测边后方交会自由设站放样方法进行了对比分析,并以郑西客运专线渭南高架车站施工测量为例,对测边后方交会进行自由设站放样方法进行了介绍。
The paper carries out the comparison and analysis of common layout method and the free stationing layout method by using the linear-resection, and introduces the free stationing layout method to the linear-resection taking the construction survey of Weinan elevated station of Zheng-Xi passenger dedicated line as an example.
出处
《山西建筑》
2009年第3期355-355,368,共2页
Shanxi Architecture
关键词
测边后方交会
自由设站
客运专线
施工放样
linear-resection, free stationing, passenger dedicated line, construction lofting