期刊文献+

指数寿命可靠性增长评估中增长因子的确定方法 被引量:5

Determination of Growth Factor in Reliability Growth Evaluation with Exponential Life
下载PDF
导出
摘要 对于延缓纠正模式的可靠性增长试验,阶段内产品的寿命服从失效率为常数的指数分布,而阶段间的可靠性有阶跃增长,通常考虑以增长因子进行阶段间的信息传递,增长因子的确定成为关键。首先分析常用的ML-Ⅱ确定方法的局限性,提出改进的ML-Ⅱ方法,并对阶段末的可靠性作出Bayes评估。最后仿真示例表明了改进方法的有效性。 For the reliability growth tests with delayed-fix mode, the life in a stage can be assumed to follow the exponential distribution with a constant failure rate. However the reliability between stages has a growth. Usually, growth factor was used for the information transfer between stages. Thus the determination of growth factor becomes very important. The limitation of ML-Ⅱ method commonly used is analyzed and a modified ML-Ⅱ method is given. Then Bayesian evaluation method of reliability is deduced. At last, the example shows the feasibility of the modified ML-Ⅱ method.
出处 《国防科技大学学报》 EI CAS CSCD 北大核心 2008年第6期53-56,62,共5页 Journal of National University of Defense Technology
基金 国家部委基金重点项目 教育部博士点基金资助项目(20059998007)
关键词 可靠性增长 延缓纠正模式 增长因子 ML-Ⅱ方法 Bayes评估 reliability growth delayed-fix mode growth factor ML- Ⅱ method Bayesian evaluation
  • 相关文献

参考文献6

  • 1Maurizio G, Gianpaolo P. Automative Reliability Inference Based on Past Data and Technical Knowledge[J]. Reliability Engineering and System Safety, 2002, 76: 129-137.
  • 2Reffaela C, Maurizio G. A Reliability-growth Modal in a Bayes-decision Framework[J]. IEEE Trans. on Reliability, 1996, 45(3): 505- 510.
  • 3Robinson D G, Dietrich D. A New Nonparametric Growth Model[J]. IEEE Trans. on Reliability, 1987, 36(10): 411-418.
  • 4王华伟.液体火箭发动机可靠性增长分析与决策研究[J].宇航学报,2004,25(6):655-658. 被引量:5
  • 5张金槐.Bayes可靠性增长分析中验前分布的不确定方法及其剖析[J].质量与可靠性,2004(4):10-13. 被引量:14
  • 6Pandey A, Singh A, Zimmer W J. Bayes Reliability Estimation Using Multiple Source of Prior Information: Binomial Sampling[ J]. IEEE Trans. on Reliability, 1994, 43(1 ) : 511 - 520.

二级参考文献11

  • 1张金槐 唐雪梅.Bayes方法[M].长沙:国防科技大学出版社,1989..
  • 2Duane J T.Leaming curves approach to reliability monitoring[J].IEEE Transaction on Aerospace,1964:563-566
  • 3Crow L H.Reliability analysis for complex repairable system[R].ADA0296,1975
  • 4Harry P.Savchuk,Harry F.Martz.Bayes reliability estimation using multiple sources of prior information:Binomial sampling[J].IEEE Transaction on Reliability,1994,43(1):138-144
  • 5Guida M,Calabria R,Pulcini G.Bayes inference for a non-homogemeous passion process with power intensity power intensity law[J].IEEE Transaction on Reliability,1989,38(4):603-609
  • 6Erto P,Rapone M.Non-informative and practical Bayesian confidence bounds for reliable life in the Weibull model[J].Reliability Engineering,1984,7:181-191
  • 7张金槐.多种验前信息源情况下的融合验后分布[J].飞行器测控技术,1998,17(3):28-35. 被引量:17
  • 8张金槐.Bayes方法稳健性检验[J].飞行器测控学报,1999,18(3):1-6. 被引量:9
  • 9张士峰.多源验前信息的融合方法[J].飞行器测控学报,2000,19(1):26-30. 被引量:13
  • 10王华伟,周经伦,何祖玉,沙基昌.小样本复杂系统可靠性增长评定研究[J].系统工程与电子技术,2003,25(4):425-426. 被引量:2

共引文献17

同被引文献196

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部