多目标优化模型在工程网络计划中的应用研究 被引量:4

Application study of multi-goal optimization model in network project
下载PDF
导出
摘要 探讨工程工期、成本和资源均衡的多目标优化模型,建立多目标规划模型,利用网络计划软件和目标规划计算软件,对网络进行优化,从而使工程网络计划达到总体最优。通过工程实例对建立的多目标优化模型进行验证,并绘制出优化前和优化后的双代号时标网络图,以说明该模型的优越性和可行性。 This article discusses project duration, cost and resource balance of multi- objective optimization model, and builds multi - goal optimization model, then uses network plan software and programming software to make network plan optimum. This paper verifies multi - objective optimization model through a project as example, and draws two - time scale code network figure that before optimization and after optimization, and shows the superiority and feasibility of the model.
作者 刘莉
出处 《平顶山工学院学报》 2008年第6期10-13,共4页 Journal of Pingdingshan Institute of Technology
关键词 网络计划 多目标优化 工期优化 network project multi- objective optimization construction period optimization
  • 相关文献

参考文献7

二级参考文献20

  • 1杨耀红,汪应洛,王能民.工程项目工期成本质量模糊均衡优化研究[J].系统工程理论与实践,2006,26(7):112-117. 被引量:55
  • 2玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 3Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.
  • 4Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.
  • 5Babu A J G,Suresh N.Project management with time,cost and quality considerations[ J ].European Journal of Operational Research,1996,88(2):320-327.
  • 6Liem Tran,Lucien Duckstein.Comparison of fuzzy numbers using a fuzzy distance measure[ J ].Fuzzy Sets and Systems,2002,130:331-341.
  • 7McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 8Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 9Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
  • 10Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.

共引文献191

同被引文献29

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部