摘要
文章对吊车整体起吊π型水泥杆的现场布置进行探讨,提出吊车整立π型水泥电杆的施工方法及注意事项,该施工方法适用于交通方便,适合大型机械操作的地区,具有工具使用简洁、施工工效高、节约、环保的优点,通过实际施工,证明此方法可以安全、优质、高效地完成π型水泥电杆的组立施工。
the paper makes a probe on the field layout of π form cement pole integral lifting by crane, and proposes the lifting construction method and instructions. The method is adapts to the areas with convenient transportation, plain landform and large - scale mechanism, and it has advantages of compact facilities, high efficiency, saving cost and environmental protection. Through practical construction, it has been proved that the method can accomplish the form cement pole integral lifting safe, high quality and efficiency.