摘要
将FAHP方法结合工程实例,在风险识别的基础上,运用层次分析法构造工程项目施工阶段成本风险系统层次模型,确定权重系数。应用模糊数学方法进行该阶段成本风险模糊综合评价,明确系统总风险度,并对风险因素予以重要性排序,找出影响工程项目施工阶段的主要成本风险因素。
Fuzzy analytic hierarchy process (FAHP) was adopted to establish a systematical model of cost risk evaluation to determine the weight coefficient. A. comprehensive evaluation of the cost risk of certain construction project was conducted via fuzzy mathematic method. The overall risk degree was ascertained and the risky factors were sequenced with respect to importance order. Main risky factors that influenced the construction project were determined.