建设物流方案多目标均衡优化模型研究 被引量:3

Multiobjective tradeoff optimization model of implementation scheme in project logistics
下载PDF
导出
摘要 为解决建设物流项目实施方案中的工期、成本、安全等多目标综合优化问题,提出了以决策网络计划法为基础,以多属性效用函数为理论建立的"工期—成本—安全"均衡优化模型。采用自适应遗传算法求解,并利用自适应调节参数提高模型的求解效率。通过某大型化工设备运输与安装方案的优化实例,对模型的合理性和算法的有效性进行了验证。结果表明,采用该模型求解建设物流项目实施方案的多目标优化问题,可以解决工序变量函数关系不明确、不同优化目标相互之间难以兼顾、决策点数目较多的难题。 To solve comprehensive multiobjective optimization of implementation scheme about time, cost and security in project logistics, a time-cost-security tradeoff optimization model, which was based on decision network planning technique and multi-attribute utility function theory, was proposed. Self-adaptive genetic algorithm was applied and self adaptive control parameters were provided to improve the resolution efficiency. Finally, a case study of transportation and installation implementation scheme of large chemical equipment was given to verify the validity of the model and feasibility of solution method. Results showed that the presented method could solve problems such as uncertain function relationships among variables in one process, tradeoff optimization of different objects and calcu lating difficulties caused by the excessive amount of decision points.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第12期2312-2316,共5页 Computer Integrated Manufacturing Systems
关键词 建设物流 多目标优化 决策网络计划 多属性效用函数 遗传算法 project logistics muhiobjective optimization decision network planning multi attribute utility function genetic algorithm
  • 相关文献

参考文献9

二级参考文献32

  • 1史亮,邹谊,尹燕,庄镇泉.基于主动进化遗传算法的模糊聚类技术[J].小型微型计算机系统,2005,26(2):204-208. 被引量:5
  • 2宣以政.工程项目网络计划的综合优化及其动态优化管理[J].成都大学学报(自然科学版),1996,15(2):38-42. 被引量:13
  • 3玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 4Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.
  • 5Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.
  • 6Babu A J G,Suresh N.Project management with time,cost and quality considerations[ J ].European Journal of Operational Research,1996,88(2):320-327.
  • 7Liem Tran,Lucien Duckstein.Comparison of fuzzy numbers using a fuzzy distance measure[ J ].Fuzzy Sets and Systems,2002,130:331-341.
  • 8McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 9Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 10Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.

共引文献269

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部