基于贡献度的项目调度方法研究 被引量:8

Project scheduling method based on the contribution index
下载PDF
导出
摘要 为改进传统的项目管理方法,提出了一种由统计理论得出的指标—贡献度来决定在关键链识别过程中的冲突解决策略,以达到识别出项目关键链的目的。为使调度计划在不确定性环境下能够顺利实施,该调度方法充分考虑了项目执行过程中工序的随机性。在此基础上,提出了一种关键链识别方法,最后针对标准问题库PSPLIB中的典型算例,应用Matlab进行了仿真验证。 To improve traditional project management methods, a conflict resolution strategy in identifying the critical chain of the project by using the contribution index coming from the statistical theory was proposed. To realize smooth implementation of project scheduling under uncertain environment, the randomness of the project procedure during the project execution process was taken into consideration in this method. Based on the strategy, a new criti cal chain identification method was introduced. Finally, based on one standard instance from the well known PSPLIB benchmark set, simulation evaluation to this method in Matlab environment was presented.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第12期2431-2435,共5页 Computer Integrated Manufacturing Systems
基金 国家973计划资助项目(2005CB724100) 国家863计划资助项目(2007AA04Z110,2007AA04Z190) 国家自然科学基金资助项目(70271053,70772056)~~
关键词 项目管理 项目调度 关键链 瓶颈 贡献度 project management project scheduling critical chain bottleneck contribution index
  • 相关文献

参考文献11

  • 1艾利·高德拉特.关键链[M].北京:电子工业出版社,2006.
  • 2刘士新,宋健海,唐加福.关键链——一种项目计划与调度新方法[J].控制与决策,2003,18(5):513-516. 被引量:56
  • 3HERROELEN W,LEUS R. On the merits and pitfalls of critical chain seheduling[J]. Journal of Operations Management, 2001,19(5):559- 577.
  • 4WILLIAMS T M. Risk management: what is critical[J].International Journal of Project Management, 1993, 11 (4); 197-200.
  • 5WILLIAMS T M. The contribution of mathematical modeling to the practice of project management[J].IMA Journal of Management Mathematics, 2003,14 (1) : 3-30.
  • 6GOLENKO-GINZBURG D, GONIK A. A heuristic for network project scheduling with random activity durations depending on the resource allocation [J]. International Journal of Production Eco nomics, 1998,55(2) :149-162.
  • 7GOLENKOGINZBURG D, GONIK A. Stochastic network project scheduling with non-consumable limited resources[J].International Journal of Production Economics, 1997,48 (1) : 29-37.
  • 8GOLENKO-GINZBURG D. On the distribution of activity time in PERT[J]. Journal of Operational Research Society, 1988, 39 (8) :767-771.
  • 9WILLIAMS T M. Criticality in stochastic networks[J].Journal of Operational Research Society,1992,43(4):353-357.
  • 10赵道致,廖华,刘一骝.关键链法:一种新型的项目进度计划方法[J].天津理工大学学报,2005,21(2):8-12. 被引量:32

二级参考文献22

  • 1Goldratt E M, Cox J. The Goal E M1. 2nd ED.Aldershot :Gower, 1993.
  • 2Goldratt E M. It's Not Luck[M]. Aldershot: Cower,1994.
  • 3Goldratt E M. Critical Chain [M]. MA.. The North River Press, 1997.
  • 4Rand G K. Critical chain: The theory of constraints applied to project management [J]. Int J of Project Management, 2000, 18(3): 173-177.
  • 5Steyn H. An investigation into the fundamentals of critical chain project scheduling [J]. Int J of Project Management, 2000, 19(6). 363-369.
  • 6Herroelen W, Leus R. On the merits and pitfalls of critical chain scheduling[J]. J of Operations Management, 2001, 19(5): 559-775.
  • 7Wei C C, Liu P H, Tsai Y C. Resource-constrained project management using enhanced theory of constraint[J]. Int J of Project Management, 2002,20(7) : 561-567.
  • 8Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct(EPC) projects [J]. Int J of Project Management,2002, 20(4): 253-262.
  • 9Brucker P, Drexl A, Mohring R,et al. Resource-constrained project scheduling: Notation, classifi-cation,models, and methods[J]. European J of Operational Research, 1999, 112(1):3-41.
  • 10Blackstone J. Complexity of computer scheduling algorithms under resource constraints[ A]. First meeting of the AFCETSMF on applied mathematics[ C]. Poland: Palaiseau, 1978.169- 178.

共引文献86

同被引文献148

引证文献8

二级引证文献95

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部