摘要 汶川特大地震发生,四川省共有153个县(市、区)不同程度受灾,全省灾区需完成城乡住房重建49131.22万m^2(445.4万套),重建城乡住房规划受到资源、环境的制约。通过对其制约因素分析,提出了对环境保护、资源保护有针对性的措施和对策,并对住房选址和建设生态人居环境提出了建议,有利于灾后重建城乡住房规划向建设生态人居环境方向发展。 Wenchuan earthquake occurred in Sichuan Province. A total of 153 counties (cities,districts) were affected in various degrees. The province' s urban and rural areas need to complete the housing reconstruction of 491 312 200 m^2 (4.454 million sets). The reconstruction plan of urban and rural housing is subjected to resources and environment constraints. The analysis of the constraints is targeted for environmental protection,resource protection measures and countermeasures. Requirements of house selection and habitation environment establishment are proposed which is beneficial to the development from post-disaster reconstruction plan of urban and rural housing to ecotypic habitation environment establishment.
出处 《后勤工程学院学报》 2009年第1期78-85,共8页 Journal of Logistical Engineering University
基金 国家环境保护部抗震救灾任务
关键词 灾后重建 城乡建设规划 环境制约因素 环境保护对策 post-disaster reconstruction urban and rural construction plan environmental constraints environmental protection measures
  • 相关文献

同被引文献12

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部