摘要
以江苏省靖江市德诚城市广场工程的深基坑支撑系统拆除为例,介绍了一种突破支撑系统常规拆除顺序的新方案,实践证明此方案简单可行,能有效缩短工程工期,值得推广应用。
This paper takes the removal of deep foundation pit support system of Jingjiang Decheng city square in Jiangsu province as an example, introduce a new programme which break the ordinary removal sequence of support system. The new programme is simple and feasible and can effectively reduce the project construction period, it is worth extending and applicating.
出处
《山西建筑》
2009年第4期159-160,共2页
Shanxi Architecture
关键词
深基坑
支护结构
快速拆除
deep foundation pit, support system, rapid removal