摘要
灌注桩技术是处理软土地基的一种方法,烧香河闸地基淤泥厚度达20 m,新闸建设主要采用灌注桩作为地基处理方案。介绍了灌注桩在烧香河闸拆建工程中的施工及质量控制过程,旨在为类似工程的施工提供参考。
Cast - in - place pile technique is a method for treatment of soft foundations. During construction of the Shaoxianghe Sluice where the foundation sludge is 20m deep, foundation treatment is mainly made by cast - in - place piles. The paper describes the construction and quality control of cast - in - place piles for the rehabilitation of the Shaoxianghe Sluice, providing reference for similar projects.
出处
《西北水电》
2008年第6期30-32,共3页
Northwest Hydropower
关键词
灌注桩
软土地基
施工
质量控制
cast - in - place pile
soft foundation
construction
quality control