大渡河金川水电站两岸卸荷岩体固结灌浆试验工艺研究 被引量:3

Study of test technology for consolidation grouting of stress-released rock on both banks of Jinchuan hydropower station
下载PDF
导出
摘要 根据金川水电站的工程地质条件,对卸荷带的固结灌浆采用了定量与间歇灌浆相结合的方法,结合水泥砂浆液或加入水玻璃的方法,对特大注入量部位处理效果明显。选用5 m段长时,最大灌浆压力控制在2.0 MPa,在不发生抬动的前提下最大灌浆压力可提高到2.5 MPa。灌浆起始浆比为0.5∶1,可调整灌浆孔的顶角,增大与裂隙的交角,以提高灌浆效果。 Based on the engineering geological conditions of Jinchuan hydropower station on the Dadu river, consolidation grouting of the stress - released zone was conducted by quantitative grouting method in combination with intermittent grouting method. By using cement sand grout or adding water glass, remarkable treatment results were obtained in locations where the grout take is very large. It is suitable to control the maximum grouting pressure at 2.0 MPa in 5 m long section, which may be increased to 2.5 MPa in case of no upheaving. The initiating grout ratio is 0. 5 : 1. The grouting result is improved by adjusting the top angle of grouting hole and increasing the intersection angle with fissures.
作者 钱宁
出处 《西北水电》 2008年第6期55-57,共3页 Northwest Hydropower
关键词 卸荷岩体 固结灌浆 试验工艺 金川水电站 stress - released rock consolidation grouting test technology Jingchuang hydropower station
  • 相关文献

同被引文献25

引证文献3

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部