摘要
通过分析影响隔层传爆序列爆轰传递性能的各个可能因素,结合隔层传爆序列的特点,提出了一种评估爆轰传递可靠性的试验方法。采用该方法对某传爆序列起爆主炸药的可靠性进行了评估,获得了较满意的结果。这些分析结果及可靠性评估试验方法为隔层传爆序列的设计及可靠性评估提供参考。
Various probable factors affecting the detonation transfer performances of interlayer initiation train were analyzed. Combing with the characteristics of two interlayer initiation trains with different shape, a test method of evaluating the detonation transfer reliability was presented. By means of this method, the reliability of one interlayer initiation train initiating main charge was evaluated, and the satisfactory results were obtained. The analysis results obtained from reliability test methods are useful to design interlayer initiation train or to evaluate the reliability of this train.
出处
《火炸药学报》
EI
CAS
CSCD
2008年第6期8-11,共4页
Chinese Journal of Explosives & Propellants
关键词
爆炸力学
隔层
传爆序列
可靠性
试验方法
explosive mechanics
interlayer
initiation train
reliability
test method