介绍了宁夏750kV电网工程前期的环境、水土资源、文物、压覆矿产资源保护和地质灾害防治,"750kV交流、±500kV直流及大机组群接入宁夏电网"及750kV设备选型的研究状况。
Introduces the previous period research status of environmental protection, water and soil conservation, cultural relic and covering mineral resources protection, and the earthquake disaster, the previous research of 750kV AC, ±500kV DC and large units group connecting into Ningxia Power Grid, and the 750kV equipment choice, in the Ningxia 750kV Power Grid.
出处
《宁夏电力》
2008年第6期4-8,共5页
Ningxia Electric Power
关键词
750kV
电网
技术
研究
750kV
power grid
technology
research