摘要
软件项目通常采用LOC(Line Of Code软件规模代码行)衡量项目规模。软件开发工作量和工期估算历来比较复杂,因为软件本身的复杂性、历史经验和估算工具的缺乏,以及一些人为错误,导致软件项目的规模估算和实际情况相差甚远。本文通过具体实例探索出一套适合衡量软件项目规模的计算方法,在详细分析数据的基础上,提出了一种可行的LOC软件估算方法,从而提高软件项目管理的水平。
Software project are often uses LOC ( Line of Code software size line of code ) to measure the size of projects. Software development workload and estimated time limit have always been more complicated, because of the complexity of the software itself, historical experience and estimates of the lack of tools, and some human error, resuiting in software projects and the scale of the actual situation falls far short of estimates. Through specific examples explores a set of software suitable for measuring the method of calculating the scale of the project, detailed analysis of data on the basis that its practical application in the software estimation methods, a more comprehensive analysis of the complexity of system development, for Software project management reference, raising the level of project management software.
出处
《吉林农业科技学院学报》
2008年第4期79-80,87,共3页
Journal of Jilin Agricultural Science and Technology University
关键词
项目估算
数据
代码
规模估计
project estimation
data
code
scale estimation