期刊文献+

青海境内黄河已建梯级电站对年径流影响分析

Analysis of the Influence of Annual Runoff of Constructed Cascade Hydropower Station of the Yellow River in Qinghai Province
下载PDF
导出
摘要 青海境内黄河梯级电站分布在唐乃亥水文站和循化水文站之间,利用实测和还原后的径流资料,定量分析了青海境内已建梯级电站对黄河年径流的影响。受到龙羊峡等水库调节影响,径流年际年内分配趋于均匀化,将汛期(7~10月)22.6%的水量经调节转移到11月~12月和次年1~5月,并具有多年调节特性。 The cascade hydropower stations of the Yellow River in Qinghai Province is located between the Tangnaihai and Xunhua Hydrology Station, by the observed data and restored data of runoff, the author analyzed the influence of annual runoff by the constructed cascade hydropower station in Qinghai Province quantitatively. Regulation by the Longyangxia Reservoir, annual distribution of runoff tends to uniformity, 22.5 percent of the water- quantity of flood season(from July to Oct. ) regulated to Nov. Dec. and Jan. to May next year, and the reservoir has multi - regulating characteristics.
作者 密玲
出处 《水利科技与经济》 2008年第11期885-887,891,共4页 Water Conservancy Science and Technology and Economy
关键词 已建梯级电站 年径流 影响 黄河 Constructed Cascade Hydropower Annual Runoff Influence Yellow River
  • 相关文献

参考文献4

二级参考文献11

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部