摘要
本文介绍了在国际招标工程项目中面对低报价现实,采取积极的应对措施,通过强化内部精化管理,独特恰当的商务经营运作,使企业利益获得了最大化,以此得到了经济有效的索赔。通过工程实践,总结出国际工程变更结算的几点经验,值得同行借签。
The paper introduces the positive countermeasures to facing the realism of the low bidding in the international bidding engineering project. To strengthen and elaborate the internal management and operate the business properly is favorable to obtain the maximum benefit and effective claim. The paper provides the summary of experiences under the practice, which gives a reference to the peers.