1Herroelen W, De Reyck B & Demeuleester E. Resource-constrained project scheduling-a survey of recent development [J]. Computer and Operation Research, 1998, 25 .. 279- 302.
2Bedworth D D, Bailey J E. Integrated Production Control System[M]. John Wiley & Sons, 1982.
3Blazewicz J J, Lenstra J K, Rinnooy Kan A H G. Scheduling projects subject to resource constraints., classification and complexity[J]. Discrete Applied Mathematics, 1983, 5..11-24.
4Morton T E, Pentico D W. Heuristic Scheduling Systems[M]. John Wiley & Sons, Inc. , 1993.
5Vance P H. Branch-and-price algorithm for the one-dimensional cutting stock problem[J]. Computational Optimization and Application, 1998, (9):211-228.
6Ponnambalam S G, Aravindan P, Mogileeswar Naidu G. A comparative evaluation of assembly line balancing heuristics[J]. The International Journal of Advanced Manufacturing Technology, 1999, (15):577-586.