基于S曲线平移法的多船建造工时均衡性研究

下载PDF
导出
摘要 采用造船工时S曲线动态右平移的方法对多船建造工时进行模拟,运用均值、标准差、变化系数指标对模拟数据进行分析,预测出多船建造的最佳均衡工时和日期,为船舶建造日程计划的编制确立了基础。
出处 《中国管理信息化》 2009年第1期60-62,共3页 China Management Informationization
  • 相关文献

参考文献4

二级参考文献10

  • 1Herroelen W, De Reyck B & Demeuleester E. Resource-constrained project scheduling-a survey of recent development [J]. Computer and Operation Research, 1998, 25 .. 279- 302.
  • 2Bedworth D D, Bailey J E. Integrated Production Control System[M]. John Wiley & Sons, 1982.
  • 3Blazewicz J J, Lenstra J K, Rinnooy Kan A H G. Scheduling projects subject to resource constraints., classification and complexity[J]. Discrete Applied Mathematics, 1983, 5..11-24.
  • 4Morton T E, Pentico D W. Heuristic Scheduling Systems[M]. John Wiley & Sons, Inc. , 1993.
  • 5Vance P H. Branch-and-price algorithm for the one-dimensional cutting stock problem[J]. Computational Optimization and Application, 1998, (9):211-228.
  • 6Ponnambalam S G, Aravindan P, Mogileeswar Naidu G. A comparative evaluation of assembly line balancing heuristics[J]. The International Journal of Advanced Manufacturing Technology, 1999, (15):577-586.
  • 7布鲁迪(冯舜玺 罗平 裴伟东译).组合数学[M].北京:机械工业出版社,2001..
  • 8宋华明,韩玉启,李如俊.基于遗传算法的装配线负荷平衡[J].机械设计与制造,2002(4):28-30. 被引量:13
  • 9贾志欣,殷国富,胡晓兵,舒斌.一维下料方案的遗传算法优化[J].西安交通大学学报,2002,36(9):967-970. 被引量:34
  • 10刘寅东.基于分布式专家系统的造船生产流程建立方法[J].中国造船,2003,44(4):1-4. 被引量:5

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部