期刊文献+

框架桥顶进施工时既有铁路架空加固技术 被引量:13

Strengthening Techniques for the Elevated Existing Railway During the Construction of the Framed Bridge
下载PDF
导出
摘要 结合郑州东绕城公路下穿京广铁路框架桥顶进施工,介绍在不中断既有铁路运营行车的条件下,采用吊轨、纵梁、横梁相结合加固架空既有铁路、顶进框架桥的施工技术。该方案的采用成功解决了框架桥顶进时既有线路架空跨度大的施工难题。 With the forward-driving construction of the framed bridge underlying the existing railway of the Zhengzhou Round-city Highway as a practical example, the construction techniques for lifting tracks, and the combination of longitudinal beams and transverse beams to strengthen the existing railway for the for-ward-driving construction of large-spanned bridges under the elevated existing railway without interrupting the normal operation of the railway are presented in the paper. The construction techniques help success-fully solve the construction problem of the elevating-spanning distance of the existing railway track being great when a framed bridge is being forward-driven under it.
作者 郭国棉
出处 《国防交通工程与技术》 2009年第1期53-56,共4页 Traffic Engineering and Technology for National Defence
关键词 既有铁路 框架箱桥 线路加固 顶进 existing railways framed box bridge strengthening of railway tracks forward-driving
  • 相关文献

参考文献2

  • 1TB 10002.1-2005.铁路桥涵设计基本规范[S],2005.
  • 2TB 10002.5-2005.铁路桥涵地基和基础设计规范[S],2005.

同被引文献54

引证文献13

二级引证文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部