摘要
针对新确定的横泉水库工业供水管线沿线地形和现状条件,结合用水户的要求,认真分析了供水管线存在的各种问题及隐患,对三个供水方案进行了详细比选,并确定了最终供水方案。
Aiming at the topography and statusquo of the new determined industrial water supply pipe line from Hengquan Reservoir,combining the request of water users,the paper carefully analyzes assorted existing problems and hidden dangers,compares three plans of water supply in datail. Finally one water supply plan is selected.
出处
《山西水利科技》
2009年第1期42-44,共3页
Shanxi Hydrotechnics
关键词
工业供水管线
供水方案
消能
供水量
industrial water supply pipe line water supply plan energe dissipation amount of water supply