基于等响应风险约束的动态经济调度 被引量:15

Dynamic Economic Dispatch with Equal Response Risk Constraints
下载PDF
导出
摘要 动态经济调度中确定性的旋转备用处理方法,无法将系统各时段的响应风险维持在一定水平。由此,文中提出一种基于等响应风险约束的动态经济调度方法,使备用容量可以根据系统的运行状况自动调整,将系统各时段的响应风险维持在给定水平。采用电力不足期望(EDNS)作为系统响应风险指标,通过引入{0,1}变量导出EDNS指标的解析表达,使给定的EDNS指标限值可以作为约束嵌入传统动态经济调度中形成标准的{0,1}混合整数优化问题,达到响应风险评估与调度决策同步完成的目的。对于所形成的{0,1}混合整数优化问题,引入附加约束将其转化为已有成熟算法的非整数二次优化问题,并采用原—对偶内点法进行求解。算例分析表明了所述方法的有效性。 In the conventional dynamic economic dispatch methods, the spinning reserve allocation is based on deterministic criterion. It is hard to maintain response risk at a given level for all periods. A novel method is proposed to overcome the problem. The system spinning reserve requirement is no longer fixed but flexible in the new method, and it is adjusted with the system operating situation to achieve equal system response risk during dispatching time intervals. Expected demand not supplied (EDNS) is used as a response risk index. To ensure that the limit of EDNS be treated as one of constraints in the dynamic economic dispatching, a new expression of EDNS which includes {0,1 } variables is introduced. As such, the response risk evaluation can be embedded into the dynamic economic dispatching, and they can be calculated together. The model is a mixed integer programming problem. To solve the problem, additional constraints for binary variables are used to transform the mixed integer programming problem to a quadratic optimization problem. And decoupled primal-dual interior point method is used to achieve solutions. Test results show the efficiency of the proposed method.
出处 《电力系统自动化》 EI CSCD 北大核心 2009年第1期14-17,共4页 Automation of Electric Power Systems
基金 国家自然科学基金资助项目(50377021 50677036)~~
关键词 动态经济调度 旋转备用 响应风险 混合整数优化 内点法 dynamic economic dispatch spinning reserve response risk mixed integer programming interior point method
  • 相关文献

参考文献14

  • 1朱涛,于继来.NON-AGC机组协同AGC机组的高峰调度模型[J].电力系统自动化,2007,31(3):9-14. 被引量:13
  • 2HAN X S, GOOI H B, KIRSCHEN D S. Dynamic economic dispatch: feasible and optimal solutions. IEEE Trans on Power Systems, 2001, 16(1): 22-28.
  • 3WOOD W G. Spinning reserve constrained static and dynamic economic dispatch. IEEE Trans on Application Systems, 1982, 101(2): 381-388.
  • 4吴集光,刘俊勇,牛怀平,段登伟,刘继春,凌亮.电力市场环境下最优备用容量的确定[J].电力系统自动化,2005,29(15):10-13. 被引量:59
  • 5齐先军,丁明.发电系统中旋转备用方案的风险分析与效用决策[J].电力系统自动化,2008,32(3):9-13. 被引量:16
  • 6FOTUHI-FIRUZABAD M, BILLINTON R, ABORESHAID S. Spinning reserve allocation using response health analysis. IEE Proceedings: Generation, Transmission and Distribution, 1996, 143(4) : 337-343.
  • 7BILLINTON R, ALLAN R N. Reliability evaluation of power systems. Plenum Press, 1996.
  • 8赵渊,周家启,周念成,谢开贵,刘洋,况军.大电力系统可靠性评估的解析计算模型[J].中国电机工程学报,2006,26(5):19-25. 被引量:96
  • 9BOUFFARD F, GALIANA F D. An electricity market with a prohabilistic spinning reserve criterion. IEEE Trans on Power Systems, 2004, 19(1): 300-307.
  • 10XIE K, SONG Y H. Dynamic optimal power flow by interior point methods. IEE Proceedings: Generation, Transmission and Distribution, 2001, 148(1): 76-84.

二级参考文献84

共引文献243

同被引文献236

引证文献15

二级引证文献311

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部