摘要
总结大唐王滩发电公司辅助车间辅控网设计、实施及完善的方案和经验得出:(1)辅控网设计应统一规划;(2)输煤程控系统主站和各远程站间应采用光纤联接;(3)采取折衷方案解决测点较多的系统负荷偏重的问题;(4)改变干除灰及脱硫控制系统的配置,以解决通讯超时中断的问题。
The scheme and experience of designing, implementing, and perfecting the auxiliary control networks in auxiliary workshops of Wangtan Power Generation Co Ltd have been summarized as follows: (1)the design of auxiliary control networks should have a unified plan; (2)in programmed control system of coal handling,optical fibre connection must be adopted between main station and each remote station; (3)adopting compromise scheme for solving the problem of heavy load in system boasting more measuring points; (4) changing configuration of control systems for dry ash -handling, and for desulphurization, solving the problem of over- time interruption in communication.
出处
《热力发电》
CAS
北大核心
2009年第1期90-91,共2页
Thermal Power Generation
关键词
发电厂
辅助车间
可靠性
测试
冗余
power plant
auxiliary workshop
auxiliary control network
reliability
testing
redundance