摘要
介绍了-310 m南18-2层冲击地压煤层综合治理的具体实施措施和监测方法。通过一系列具体措施和方法对该区冲击地压的预防和治理,取得了明显的效果。
The author has introduced the specific implementation and monitoring methods of comprehensive management of rock burst seam on --310 Southern 18--2 layer, which have been proved effective to prevent and control rock burst.
出处
《江西煤炭科技》
2009年第1期70-72,共3页
Jiangxi Coal Science & Technology
关键词
冲击地压
钻粉率
高压注水
卸压
rock burst
drilling dust rate
high--pressure water injection
relief