三峡水利枢纽工程机电设计关键技术研究概述 被引量:1

Research summary of key technologies on electro-mechanical design of TGP
下载PDF
导出
摘要 长江三峡水利枢纽规模宏大,枢纽建筑物多,运行条件复杂,其机电工程设计存在诸多世界性难题,长江委设计院自20世纪50年代起,即开展三峡水利枢纽的机电设计研究。这些研究包括:700 MW水轮发电机组总体设计、主厂房1 200 t/125 t单小车桥式起重机、电站装机进度、电气主接线设计、500 kV G IS、接地技术、大电流封闭母线、计算机监控系统总体设计、励磁系统方案设计及干式励磁变压器的研究、发电机继电保护、通信系统、五级船闸监控系统、蜗壳保温保压装置设计、双线五级船闸消防设计。上述设计研究大多处于世界水电技术的先进水平。三峡水利枢纽现已全部完工,开始发挥综合效益。 TGP can be characterized as large scale and multi-structure projects with complicated operation condition facing worldwide challenge on most of its electro-mechanical design.Since 1950s,Design Institute of Changjiang Water Resources Commission has conducted a series of researches on electro-mechanical design of TGP including general design of 700 MW hydro generating unit,single hoist over-head crane with capacity of 1 200 t/125 t in main power house,unit installation procedure,500 kV GIS,earthing technology,large current enclosed bus,general design of computer control and supervision system,excitation system design and dry type excitation transformer,protective-relay device for generator,communication system,supervision system for 5-step ship lock,temperature insulation and pressure maintaining device for spiral case,fire protection design for 5-step ship lock.Most of abovementioned designs and researches has achieved the advanced level in the world.TGP has been completed at present and begun to yield comprehensive benefits.
出处 《人民长江》 北大核心 2009年第2期9-12,36,共5页 Yangtze River
关键词 机电工程 机电设计 关键技术 三峡水利枢纽 electro-mechanical engineering electro-mechanical design key technology TGP
  • 相关文献

同被引文献9

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部