摘要 Electrical power transmission is dominated by overhead line systems at present.This is mainly based on more than hundred years of experience of utilities in running overhead lines.Furthermore,overhead lines have proven their operational reliability and functional assurance.In the past,cables were used in distribution networks in urban areas for the most part with the exception of direct current submarine cables.New developments of high voltage XLPE cables make it possible to use this technology for EHV level applications in transmission networks.Within this paper,mixed network configurations,consisting of overhead lines and high voltage cables,are investigated.An exemplary EHV transmission line with a total length of about 100 km,which is quite typical for Central Europe,has been studied.Several different line combinations are discussed with varied rates between overhead line sections and cable sections length in practice.The length of the cable sections are ranging from several kilometers up to lengths of 100 km.In this paper the work focuses on the transient behavior of combined 400 kV overhead and cable lines during switching processes and lightning impacts.A number of calculations were carried out to get an overview of the transient stress in numerous network nodes along the transmission system.Numerical programs like ATP/EMTP have been used for these simulations.Peak values and wave shapes of the transient voltage stress have been evaluated,based on different systems and within possible combinations.In respect of the insulation coordination and transient stress at network nodes,the voltage-time trends are also analyzed.The combination of high voltage overhead and cable transmission systems,especially such with lengths of more than about 50 km,are making tightened and extended demands to the network design,to the operational management and of course to the network protection also.As an output of this investigations,the results might influence the strategy in running this new type of combined transmission systems. Electrical power transmission is dominated by overhead line systems at present.This is mainly based on more than hundred years of experience of utilities in running overhead lines.Furthermore,overhead lines have proven their operational reliability and functional assurance.In the past,cables were used in distribution networks in urban areas for the most part with the exception of direct current submarine cables.New developments of high voltage XLPE cables make it possible to use this technology for EHV level applications in transmission networks.Within this paper,mixed network configurations,consisting of overhead lines and high voltage cables,are investigated.An exemplary EHV transmission line with a total length of about 100 km,which is quite typical for Central Europe,has been studied.Several different line combinations are discussed with varied rates between overhead line sections and cable sections length in practice.The length of the cable sections are ranging from several kilometers up to lengths of 100 km.In this paper the work focuses on the transient behavior of combined 400 kV overhead and cable lines during switching processes and lightning impacts.A number of calculations were carried out to get an overview of the transient stress in numerous network nodes along the transmission system.Numerical programs like ATP/EMTP have been used for these simulations.Peak values and wave shapes of the transient voltage stress have been evaluated,based on different systems and within possible combinations.In respect of the insulation coordination and transient stress at network nodes,the voltage-time trends are also analyzed.The combination of high voltage overhead and cable transmission systems,especially such with lengths of more than about 50 km,are making tightened and extended demands to the network design,to the operational management and of course to the network protection also.As an output of this investigations,the results might influence the strategy in running this new type of combined transmission systems.
出处 《高电压技术》 EI CAS CSCD 北大核心 2008年第12期2732-2738,共7页 High Voltage Engineering
关键词 架空线路 输电系统 高压电缆 配电 绝缘体 混合系统 cable line high voltage insulation coordination lightning mixed systems overhead line switching
  • 相关文献

参考文献10

  • 1CIGRE Joint WG 21/22.01 Comparison of high voltage overhead lines and underground cables report and guidelines: CIGRE technical brochure 110[R], 1996.
  • 2CIGRE WG B1.07 Statistics of AC underground cables in power networks: CIGRE technical brochure 338[R], 2007.
  • 3Ohno H, Sakuma S, Fukunaga S, et al. Construtcion of the world's first long-distance 500 kV XLPE cable line[C]// CIGRE Session 2000. Paris: CIGRE, 2000: 21-106.
  • 4Pierre Argaut, S ren Damsgaard Mikkelsen. New 400 kV underground cable system project in Jutland[C]// Jicable 2003. Paris, 2003.
  • 5Laussegger M, et al. Italy-Austria GIL in the new planned railway galleries Fortezza-Innsbruck under Brenner pass[C]// CIGRE Session 2006. Paris: CIGRE, 2000.
  • 6Gatta F M, Lauria S. Very long EHV cables and mixed overhead-cable lines. Steady-state operation[J]. Power Tech, 2005 IEEE Russia,2005: 1-7.
  • 7CIGRE WG B1. 05 Transient voltages affecting long cables: CIGRE technical brochure 268[R], 2005.
  • 8Schulz W, Cummins K, Diendorfer G, et al. Cloud-to-ground lightning in Austria; A 10-year study using data from a lightning location system[J]. Journal of Geophysical Research, 2005, 110.
  • 9Rahimi S, Wiechowski W, Randrup M, et al. Identification of problems when using long high voltage AC cable in transmission system Ⅰ: switching transient problems[C]// IEEE/PES Transmission and Distribution Conference and Exposition. [S. l.]: IEEE/PES, 2008.
  • 10CIGRE WG 13. 04 Line-charging current switching of HV lines-stresses and testing: CIGRE technical brochure 47[R], 1996.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部