摘要 由于供电可靠性的需要,110kV变电站要求采用双电源供电,一回作为主供,另一回热备用。当主供线路故障跳闸时,备自投装置动作将备用线路自动投入,从而保证不间断对用户供电。然而当线路故障时,却极易引起主变跳闸,造成备自投失败,就此问题进行分析供各位同行参考。 For the needs of the reliability of the power supply, 110 kV transformer substation requests the adoption of dual-power supply,one as a main power supply,the other as a preparation.When the power supply trips,the automatic backup power devices will put into use.Thus,it can guarantee the power to the users continuously. But when the line is out of order,it can easily make the main power trip,which causes the failure of automatic backup power.This article analyses this issue,which is a reference to the companions.
作者 刘佐华
机构地区 冷水江电力局
出处 《电力系统保护与控制》 EI CSCD 北大核心 2009年第2期91-92,共2页 Power System Protection and Control
关键词 备自投 动作失败 补救措施 automatic backup power failure of the action remedial measures
  • 相关文献

同被引文献88

引证文献19

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部