摘要
以济三煤矿63下04综放工作面的支架完好率对顶板控制的影响为例,阐述了工作面支架完好率与顶板控制之间的关系是相互影响、密不可分的。只有保证支架的完好率才能保证支架达到初撑力,保证了支架的初撑力才能更有效地控制工作面顶板。
The case of the availability of Jisan coal mine's Lower 63 # 04 longwall top coal caving face supports and its influence upon the roof control as an example, this paper elaborates on the very close and unseparable relations between the face support availability and the roof control. Only on the basis of guaranteeing the availability of face supports can the setting load of face supports be realized. The latter is the basis for an effective control of the roof strata.
出处
《中国煤炭》
北大核心
2008年第11期59-60,81,共3页
China Coal
关键词
完好率
初撑力
工作阻力
顶板控制
availability, setting load, working resistance, roof control