为了提高烧结产能,满足高炉利用系数提高对烧结矿的需求,炼铁厂对一烧车间2#烧结机进行了扩容改造和工艺优化。提高了烧结矿产量,改善了烧结矿质量,降低了固体燃耗,取得了较好的生产效果。
To enhance the production capacity of the sintering machine and meet the requirements for the sinter to increase the capacity factor of the blast furnace,the 180 m^2 sintering machine in the Iron-making Plant was reformed. The production of the sintering machine increased at No. 1 workshop and the quality of sinter was improved, the consumption of soild fuel decreased.
出处
《包钢科技》
2008年第6期8-10,14,共4页
Science & Technology of Baotou Steel
关键词
烧结机
改造
工艺优化
生产实践
sintering machine
modification
production practice