摘要
本文介绍该工程钢结构吊装设备选择、施工工艺,并详细说明群塔作业布置及附着方案。经过工程实践证明,该工程施工各阶段所选用的各种吊装设备科学合理、经济可行的。
Palms-holding Dagoba of Famen Temple is a special body of steel reinforced concrete structure.This construction structure particularity,time pressing,scene complex and so on many factor influences,makes the reinforcing steel structure system installment(hoisting) the equipment shaping to be ordinary the high-rise construction appears is unique and is complex.Proved after the engineering practice that the various stages of construction by the selection of hoisting equipment is scientific and rational,economically viable.
出处
《建筑机械化》
2009年第1期57-59,共3页
Construction Mechanization