摘要
通过对庙沟铁矿保有地质储量和露天结存矿量的综合分析,结合矿山生产实际,提出深部接替资源地质勘探方案并获得预期地质勘探成果。
In combination with practice operation of mine, the geological recoverable deposit and residual resource of Miaogou Open Pit Mine are analyzed. On this basis, the plan for geological exploration of follow- up resource in deep part has been established. Following this plan, the prospective results of exploration have been achieved.
出处
《矿业工程》
CAS
2009年第1期6-7,共2页
Mining Engineering
关键词
地质储量
接替资源
勘探
geological deposit
follow--up resource
plan of exploration