期刊文献+

希腊雅典调水二期工程 被引量:3

Evinos-Mornos Project in Greece
下载PDF
导出
摘要 雅典调水二期工程因连续大旱,仓卒上马。黏土心墙坝为引水枢纽中的主要建筑物,坝址调水比例66%~75%,隧洞最大埋深1250m,复理石地层,施工机械既有开敞式TBM,又有双护盾TBM,分别采用现浇钢筋混凝土及单层管片衬砌。人字坡压力输水洞不均匀输水。 The Evinos-Mornos Project was a last minute reaction under the threat of an imminent water shortage. A central clay core earth dam was main building of the water works. Ratio of downstream versus natural annual inflows is 66%- 75%. The main geological formations along the tunnel are fine-grained flysch and the tunnel was realized with both open type TBM and double shield TBM.lined with precast segment and cast in situ concrete lining and with maximum overburden of 1 200 m. For drainage purposes, the tunnel slopes downwards slightly from its center to both portals and conveys water under pressure at variable flow rates.
出处 《南水北调与水利科技》 CAS CSCD 2009年第1期89-90,30,共3页 South-to-North Water Transfers and Water Science & Technology
基金 国家"十一五"科技攻关课题"南水北调西线工程超长隧洞施工关键技术问题研究" 科技部(2006BAB04A06)
关键词 跨流域调水 调水比例 管片衬砌 压力隧洞 TBM inter-basin water transfer ratio of downstream versus natural annual inflows precast lining pressure tunnel TBM
  • 相关文献

参考文献3

  • 1Athens Water supply&Sewerage Company.EYDAP High-lights. http://www.eydap.gr/media/politis-mos/entypa/brochure.pdf . 2004
  • 2Grandori,R.,,Jaeger,M.,,Antonini,F.,Vigl.L.Evinos-Mornos Tunnel-Greece.Construction of a30kmlong hydraulic tunnel in less than three years under the most adverse geological con-ditions[].ProcRETC.1995
  • 3.Integrated Evaluation for sustainable River Basin Governance[].THE RI VER EVI NOS RESERVOIRGreece Report.2002