晶圆制造中单臂Cluster tool的建模与仿真 被引量:2

Modeling and Simulation of Single-arm Cluster Tool in Wafer Fabrication
下载PDF
导出
摘要 对于单臂的Cluster tool,由于晶圆驻留时间的约束和作业时间的波动性,还没有解析的方法能够验证其调度的可行性和有效的调度方法。介绍了晶圆制造过程并基于Petri网模型,利用eM-Plant仿真平台建立了相应的晶圆制造的仿真模型。通过实例说明仿真模型能够虚拟单臂的Cluster tool、准确地仿真单臂的Cluster tool的晶圆制造模式;晶圆制造的仿真模型为研究其调度可行性分析和控制器设计提供了一种有效的手段。 With wafer residency constraint and activity time variation, schedule feasibility for single-arm cluster tools is an important issue. Up to now, the schedulability problem for such system is still open. Based on a Petri net model, a simulation model was developed by using eM-Plant. The model can exactly simulate the process for any flow pattern just as a virtual single-arm cluster tool. Thus, by this model, schedule feasibility and schedulability can be checked.
出处 《系统仿真学报》 CAS CSCD 北大核心 2009年第2期554-557,562,共5页 Journal of System Simulation
基金 国家自然科学基金(60574066) 广东省科技计划项目(2008B010400015)
关键词 晶圆制造 CLUSTER TOOL 调度 建模与仿真 wafer fabrication Cluster tool scheduling modeling and simulation
  • 相关文献

参考文献12

  • 1Peter Van Zant.芯片制造[M].赵树武,朱践知,于世恩,等译.半导体工艺制程实用教程(第4版)Microchip fabrication:a practical guide to semiconductor processing[M].北京:电子工业出版社,2004.
  • 2J-H Kim, T-E Lee, H-Y Lee, D-B Park. Scheduling Analysis of Timed- constrained Dual-armed Cluster tools [J]. IEEE Transactions on Semiconductor Manufacturing (S0894-6507), 2003, 16(3): 521-534.
  • 3S Rostami, B Hamidzadeh, D Camporese. An Optimal Periodic Scheduler for Dual-arm Robots in Cluster Tools with Residency Constraints [J]. IEEE Transactions on Robotics and Automation (S1545-5955), 2001, 17(5): 609-618.
  • 4T L Perkinson, R S Gyumsik, P K MacLarty. Single-wafer Cluster Tool Performance: An analysis of the Effects of Redundant Chambers and Revisitations Sequences on Throughput [J]. IEEE Transactions on Semiconductor Manufacturing (S0894-6507), 1996, 9(3): 384-400.
  • 5T L Perkinson, P K MacLarty, R S Gyurcsik, R K Cavin Ⅲ. Singlewafer Cluster Tool Performance: An Analysis of Throughput [J]. IEEE Transactions on Semiconductor Manufacturing (S0894-6507), 1994, 7(3): 369-373.
  • 6W M Zuberek. Timed Petri Nets in Modeling and Analysis of Cluster Tools [J]. IEEE Transactions on Robotics and Automation (S1545- 5955), 2001, 17(5): 562-575.
  • 7S Venkatesh, R Davenport, P Foxhoven, J Nulman. A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots [J]. IEEE Trans. Semiconduct. Manuf, (S0894-6507), 1997, 10(4): 418-424.
  • 8Y-H Shin, T-E Lee, J-H Kim, H-Y Lee. Modeling and implementing a real-time scheduler for dual-armed cluster tools [J]. Computers in Industry (S0360-8352), 2001, 45(1): 13-27.
  • 9N Q Wu. Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model [J]. IEEE Trans. on Systems, Man, and Cybernetics, Part C (S1094-6977), 1999, 29(2): 192-204.
  • 10N Q Wu, M C Zhou. Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net [C]// Proceedings of 2006 IEEE Conference on Automation Science and Engineering, Shanghai, October, 2006. USA: IEEE, 2006: 85-90.

同被引文献77

  • 1周支立,李怀祖.具有材料搬运装置的机器排序问题综述[J].中国机械工程,2001,12(z1):165-168. 被引量:1
  • 2SUN T C, LAI K K, LAM K, et al. A study of heuristics for bidirectional multi-hoist production scheduling systems[J].International Journal of Production Economics, 1994,33 (1/2/3) :207-214.
  • 3AGNETIS A. Scheduling no-wait robotic cells with two and three machines[J]. European Journal of Operational Research, 2000,123 (2): 303-314.
  • 4AGNETIS A, PACCIARELLI D. Part sequencing in three-machine no-wait robotic cells[J].Operations Research Letters,2000,27(4) : 185-192.
  • 5KARZANOV A V, LIVSHITS E M. Minimal quantity of operators for serving a homogeneous linear technological process[J]. Automation and Remote Control, 1978,39 (3) : 162-169.
  • 6KATS V, LEVNER E. Minimizing the number of robots to meet a given cyclic schedule[J].Annals of Operations Research, 1997,69 (0) : 209-226.
  • 7LEUNG J M Y, LEVNER E. An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times[J]. Operations Research Letters, 2006,34 (4) : 465-472.
  • 8CHE Ada, CHU Chengbin, LEVNER E. A polynomial algorithm for 2-degree cyclic robot scheduling[J].European Journal of Operational Research, 2003,145 (1) : 31-44.
  • 9CHU Chengbin. A faster polynomial algorithm for 2-cyclic robotic scheduling[J].Journal of Scheduling, 2006, 9 (5) : 453-468.
  • 10KATS V, LEVNER E, MEYZIN L. Multiple-part cyclic hoist scheduling using a sieve method[J]. IEEE Transactions-on Robotics and Automation, 1999,15 (4): 704-713.

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部