摘要
通过对世贸服饰高层结构主要设计过程的介绍,重点介绍了CFG地基处理方案及现浇空心楼盖的设计,经采用中国建筑科学研究院开发的PKPM软件分析计算,结果表明所采取的处理措施正确,各项计算指标合理。
The mostly design process of SMFS tall building is introduced. The ground treatment.scheme of CFG and design of cast-in-situ hol- low floor'are discussed in detail. The seismic analysis results of PKPM procedure by China Academy of Building Research are given. It is found that the control measures for designing is correct and the each parameter is advisable.
出处
《山西建筑》
2009年第5期69-70,共2页
Shanxi Architecture
关键词
高层结构
地基处理
现浇空心楼盖
tall building, ground treatment, cast-in-situ hollow floor